GULF COAST–(ENEWSPF)–August 2, 2010. During final preparations to commence with the injectivity test, a small hydraulic leak was discovered in the capping stack hydraulic control system. The injectivity test, previously announced to take place today, will be rescheduled until the leak is repaired.






