72.8 F
Park Forest
Saturday, August 13, 2022
Subscribe to eNews Park Forest

Planck on Course for Safe Retirement

PLANCK

Mapping the cosmic microwave background

EU–(ENEWSPF)–21 October 2013.  In preparation for its final switch-off on 23 October, mission controllers today fired Planck’s thrusters to empty its fuel tanks. The burn is one of the final steps to ensure that Planck ends its hugely successful mission in a permanently safe configuration.

The satellite, which mapped the relic radiation from the Big Bang – the Cosmic Microwave Background, or CMB – in unprecedented detail, will be switched off in two days.

One of Planck’s two instruments, the HFI high-frequency instrument, exhausted its liquid helium supply in January 2012. Planck had by then completed five full-sky surveys using both HFI and its partner detector, the LFI low-frequency instrument.

Since January 2012, the spacecraft has conducted three more sky surveys with LFI, enabling scientists to refine their CMB data. All science operations finally came to an end on 3 October, and the payload was switched off on 19 October.

“In the past weeks, we’ve been working to prepare Planck for permanent safe disposal,” says ESA’s Steve Foley, Spacecraft Operations Manager at the European Space Operations Centre in Darmstadt, Germany.

Deputy Flight Operations Director A. Rudolph in Main Control Roo

Andreas Rudolph during Planck launch 2009

“This includes ‘passivating’ the spacecraft and placing it onto a disposal trajectory that will keep it in a parking orbit around the sun well away from the Earth–Moon system for hundreds of years.”

This is very similar to the procedure for Planck’s ‘sister’ mission, Herschel, which was deactivated in June.

“These are the first two missions ESA has flown at the scientifically valuable L2 Lagrange point, so it’s important that we set a positive precedent as to how we dispose of missions there,” says Andreas Rudolph, responsible for astronomy mission operations at ESOC.

On 9 October, controllers commanded Planck to perform a lengthy, two-day manoeuvre to move away from the Sun–Earth Lagrange point and start a slow drift away from Earth. 

Planck cruise to L2 Access the video

Today, around 12:00 GMT (14:00 CEST), the thrusters will again be switched on to burn the remaining fuel to depletion, an important aspect of rendering the spacecraft inert, as required by ESA’s space debris mitigation guidelines.

“We’ve already programmed the onboard software so that it will no longer try to automatically reactivate the transmitters, and next we will disconnect the batteries and disable the onboard protection mechanisms” says Steve.

“The final step will be the simple act of switching off the transmitters: we will witness the silencing of Planck and we will never receive a signal from her again. This is important because we cannot cause radio interference for any future mission.”

This will happen on 23 October during a small ceremony, when the final command will be sent by ESA’s Jan Tauber, the Project Scientist, who has personally invested more than a decade and a half in Planck. 

“At ESOC, our business is keeping missions alive and productive, so sending a ‘shut-down’ command is very difficult,” says Paolo Ferri, Head of Mission Operations. 

“While the end of this outstanding scientific mission was always foreseen with the exhaustion of the helium coolant, it seems fitting that we have a colleague from the science team to send the final command that once and for all silences the Planck spacecraft.”

Source: esa.int

 

Recent Articles

Stay Connected

3,827FansLike
1,274FollowersFollow
574SubscribersSubscribe

Local Advertisers

DonnerHollen Construction
Proud member of LION Publishers
Prairie State College
Dining on the Green, Downtown Park Forest

ENEWSPF NEWS ALERTS

Trending

Park Forest
clear sky
72.8 ° F
76.8 °
70.6 °
66 %
2.9mph
0 %
Sat
78 °
Sun
82 °
Mon
75 °
Tue
81 °
Wed
82 °

About Google Ads

The Google-supplied ads that appear on this website are not reviewed ahead of time and differ for each visitor. If anything offensive, inappropriate, or otherwise unwholesome appears, please notify us so we can take steps to block that specific advertiser. Email the URL or advertiser name to [email protected].